14.05.04 Validate Students for ITR

Validate students for ITR

You can either create a new student or open an existing student and set the “Validate data for” option to ITR. With this validation on, SELMA will check if all required data on the student is recorded before saving the record. Below screenshot shows the error message with detailed instructions of which fields need to be set to successfully validate the record for the ITR:

Graphical user interface, application, website

Description automatically generated

Once all data is entered and the record saved, the student is ready to be enrolled into an ITR programme.

Related Articles

14.03 UFS in SELMA

Together with the February release of SELMA, updates will be made relating to the Unified Funding System (UFS). Please study these changes carefully as there might be things to action on your side. What is changing: Source of Funding Update We added the source of funding, 37, to the selection drop down list. We will …

14.05.10 Complete ITR Enrolment

The ITR determines whether a programme enrolment is to be COMPLETED or not. This process is done on a daily basis through the ITR completions service. It runs at approximately 5am each morning. ITR enrolment cannot be completed in SELMA until is completed in ITR. Once a student has achieved all components in an enrolment, …

14.05.06 Create an ITR Intake

Before you can enrol a student, an intake for the ITR programme needs to be created and “Opened”. There is nothing different from an ITR intake compared to other intakes in SELMA. However, you cannot use an ITR intake for non ITR students. You may need to set the funding type on the intake to …

14.05.11 Withdrawing TA / Enrolment

Withdraw Training Agreement When the learner ceases training with the employer and does not intend to continue training at any time in the future, the training agreement should be withdrawn. Withdrawing the training agreement will cause all ACTIVE, GRACE, HOLD or PENDING programme enrolments to be withdrawn and the training agreement status set to FINISHED. …